本文导读:本文由留学生代写essay中心整理提供,该文为KMS设计报告essay,全文从其背景、目标设计等多个方面进行了阐述,是一份详细的设计报告。本专区还提供各类assignment格式服务,欢迎关注本站。
1 Executive summary
This report analyses and identifies some of the knowledge management issues faced by the Archetype. Then based on the problem analysis, a “content-based” knowledge management system is proposed to address these issues.
The first section of the report shows an annotated version of the rich pictures which reflects three main knowledge management issues, and then a brief description on the goals of knowledge management is raised based on these issues. Finally an updated human activity model is presented to illustrate a ideal situation.
The second section presents a proposed knowledge management system. The first part of this section shows detail description of the new proposed knowledge management in terms of four key elements. The second part presents a way to evaluation the success of proposed system. Finally, BPMN on the new proposed business process is shown to reflect how it works with current practice.
The third chapter of this report mainly shows the detailed components of the proposed http://www.ukthesis.org/Assignment_Writing/ system and corresponding screenshots. Detailed explanations are also presented at this part to reflect how to increase the knowledge sharing and transfer and also in handling their documents better.
The final part of this report comments on what have learned through the development of the scenario in terms of its strengths and weaknesses.
2 The goals of the intervention
2.1 Background
Archetype is a 25 years architectural design company specializing in heritage projects. They usually consult external experts and cooperate with other engineering firms to produce excellent architectural deliverables. It has been invited to provide services for international projects, such as UK and Singapore, and considered expanding business to overseas markets, such as China.
2.2 Annotated rich picture
According to the annotated rich picture (Figure 1), obvious problems associated with knowledge management is the inefficient sharing of knowledge including documents and experience in details as follow.
In terms of explicit knowledge (documents), there are two crucial problems shown by the rich picture. First, staffs such as junior architect think documents are useless. Second, it is difficult to reuse documents, even though similar projects can provide similar solutions codified in documents which can be searched.
In terms of tacit knowledge (experience and skills), one important problem is lack of efficient channel to share experience and skills between staffs such as junior architect and partner.#p#分页标题#e#
Based on the above analysis, three goals of the intervention in terms of KM are as follows:
1. Bring codified knowledge together and make them available across the organization in a useful way.
2. Improve the reuse of existing knowledge.
3. Shorten the experience and skill gap between people from different levels.
本文由留学生代写essay中心整理提供,更丰富的assignment格式模板参考与代写留学生dissertation相关服务尽在本站,我们将尽心为您服务。
相关文章
UKthesis provides an online writing service for all types of academic writing. Check out some of them and don't hesitate to place your order.